We did this job over 3 weeks. We started by laying down RRP plastic and containments. After, that we began wet scraping all loose material. Next, the crew applied peel away stripper to all of the surfaces to remove old lead paint. All bumpy surfaces were evened out by using Festool HEPA sanders. Any filling was done with wood epoxy and 2 part wood bondo. Finally we did a full coat of primed and top coated the project with Emerald Satin by Sherwin Williams.